Brazil / Argentina 500 kV Interconnection Project
This project involves the design and construction of 310 miles (500
kilometers) of 500 kV overhead transmission line; expansion of two 500
kV switching stations, one in Brazil and one in Argentina; one 1200
MW 500 kV Back-to-Back DC Converter Station; and all right-of-way procurement
and permitting. Black & Veatch performed the conceptual engineering,
engineering cost estimate and turnkey cost estimate, in addition to
preparing specifications for the transmission line construction, expansion
of existing substations, the new converter station and the communications
system.
|